KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
' style=
Date:  5-25-2019
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Cowling work

Installed all of the sky bolts, and both hinges on the side seams... they look pretty neat!. Some tweaking will be required to get a consistent gap, as it varies between 1/16 and 1/8".

Fitted the red box fule flow sensor after the fuel line arrived from TS Flightlines. very pleased with the result. Fitted the throttle for the last time (hopefully!)
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.