KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
' style=
Date:  3-4-2019
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Started wiring...

Installed battery box, ran main power cable through to firewall. Not the easiest stuff to work with!
Fitted the battery solenoid and Starter solenoid.
Lots of buggering about to get the cable run to look good. The new step installation proved difficult as it was in the way and needed a lot of tweaking to get it to lie without tension, and without risk of rubbing on the airframe.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.