KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
' style=
Date:  3-4-2020
Number of Hours:  10.00
Manual Reference:  
Brief Description:  fuel stuff, fairings, rudder pedal stress loading

Fitted the empennage fairings
Tidied up the wiring loom in the rear
removed the O2 cylinder from the front baggage

Found a fuel leak...tightened up a joint at the SB fuel tank fitting, and it stopped...
Drained the SB tank as it didnt match fuel levels in the port side... obviously I goofed up..
Found that the right and left fuel level indicators were switched at the GEA 24... had to take the panel apart to swap pin 6 and 9 in GEA24/424 d-sub.
refilled the tank, and set the flight and ground fuel level settings.
Both tanks now full.. and I seem to be able to get 68 litres in each tank

Took a rudde rpedal off and stress loaded it to 200kg... hopefully enough for the LAA.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.