Brief Description: Getting ready for last inspection..
3 hours pf paperwork in preparation for the penultimate inspector visit. Checked the aircraft from front to back.... butRod still found 3 nuts that needed tightening! Sorted out the trim controls as P1 and P2 moved in opposite directions! Fitted the port wing root fairings... bugger of a job with the Aerolab gascolators to work around.