KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
' style=
Date:  7-6-2019
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Canopy cutting and fixing

Moved the canopy out early again to get it hot. Final trimmed the edges to fit, then took it off. A bit flexible in the heat!

Drilled the 1/4" holes with a supporting block of wood, and at a comfortable, stable work position this time, and it all went well. Edges masked off, sanded, holes deburred, and the outer side of the 1/4 holes countersunk as per directions.

Mixed the adhesive £450 for the glue!!)and applied to the canopy, dropped the frame on, them clecoed together. It was so warm that the adhesive was solid after 4 hours. Tidied the garage whilst waiting for it to set, then sanded the rough bits down in prep for more filling and sanding, then fibreglassing.
Such a relief to have it cut and bonded in place without cracking again...
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.