KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  6-23-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Getting ready for final inspection

No pictures just finishing off stuff that seems to take for ever;

1. Torqued and installed remaing spar bots
2. Connected and tidied up the Pitot and Static line instation
3. Re-installed seat belts
4. Had Bob Redman (RV7 driver from Maitland) come over and give the plane an independent inspection. Bob came up with a list of 8 items that I have mostly rectified, this was mainly around the engine installation wiriing and using some standoffs rather then just cable ties.
5. Installed independant compass on the dash
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.