Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
RV-7
All
1-12-2009
< Previous Log Entry
Next Log Entry >
Date:
1-12-2009
Number of Hours:
2.00
Manual Reference:
Brief Description:
Left Flap
Ian came over last night and gave me a hand with the assembly of the flap, we assembled the bottom section including the ribs, made the required spacers and back drilled the hinge.
Flap assembled with spacers clecoed in place
Hinge marked and back drilled
Hinge cut to the correct length
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
All
Ailerons
Avionics
Brakes
Canopy
Center Fuselage
Centre spar
Cowling
Empennage
Engine
Fairing
Final Assembly
Firewall
Flap assembly
Flight testing
Front Fuselage
Fuselage
FWF
Instrument panel
Miscellaneous
None
Painting
Prop
Rear turtle deck
Roll Bar
Rudder
Seats
Spinner
Vertical Stab
Wheels and brakes
Wings
Zodiac 601 XL Home
Copyright © 2001-2013 Matronics. All Rights Reserved.