Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
RV-7
All
6-9-2012
< Previous Log Entry
Next Log Entry >
Date:
6-9-2012
Number of Hours:
9.00
Manual Reference:
Brief Description:
Rigging
On Saturday Dusan gave me a hand to hang the rudder, elevators, ailerons and flaps.
It took us about 4 hours to correctly rig the Elevators,install the tail wheel link and rudder cables.
Elevator throw was;
Up 30 degrees
Dw 23 degrees
We then rigged the flaps;
Up 0 degrees
Dw 45 degrees
Lastly we installed the aileron torque tube and called it a day.
Installed Elevators and Rudder
Another view
Ailerons and Flaps installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
All
Ailerons
Avionics
Brakes
Canopy
Center Fuselage
Centre spar
Cowling
Empennage
Engine
Fairing
Final Assembly
Firewall
Flap assembly
Flight testing
Front Fuselage
Fuselage
FWF
Instrument panel
Miscellaneous
None
Painting
Prop
Rear turtle deck
Roll Bar
Rudder
Seats
Spinner
Vertical Stab
Wheels and brakes
Wings
Zodiac 601 XL Home
Copyright © 2001-2013 Matronics. All Rights Reserved.