Laid out, drilled & clecoed rear channels at wing tip & root. Tip channel was cut at a 45 degree angle. Drilled & clecoed all rear channel to length by drilling rear rib angles (7V6-3) to achieve proper length. Laid out & drilled rear root doubler (7V4-3) to root channel (7V6-1).