KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
' style=
Date:  5-1-2023
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Left fuel tank sealing day 1

Work began on the left fuel tank today. This was much the same process as the right wing. Image 1 shows the pre-coating of faying surfaces of the left-wing skin. Image 2 shows the top substructure with a good slathering of sealant on all surfaces. Image 3 shows what I coat on the bottom surface on day one. (Just the upper portion of the inboard cell. This makes it easier to get a good coating on all the leading-edge surfaces)
' style=

Pre-coating skin

Pre-coating skin

' style=

Pre-coating substructure

Pre-coating substructure

' style=

Small portion of lower surface coated on day 1

Small portion of lower surface coated on day 1

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.