KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-25-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Gathered Aft Fuselage Fixture material and made St

Bought wood and hardware required for aft fuselage assembly fixture. Also made the parts needed for the hoizontal tail nose to fuselage attach weldment (have not welded yet)
' style=

.063 thick 4130 steel parts for nose rib to fuselage attach weldment

.063 thick 4130 steel parts for nose rib to fuselage attach weldment

' style=

attach weldment parts ready for welding

attach weldment parts ready for welding

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.