KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
' style=
Date:  10-16-2020
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Forward Fuselage Fixture

Built the fixture to hold the forward fuselage and wing during construction. Leveled and bolted main section to the ground
' style=

Welding Legs to Main Support Beam

Welding Legs to Main Support Beam

' style=

Leveling and Bolting Fixture to Floor

Leveling and Bolting Fixture to Floor

' style=

Spar Center Section Installed at 1 Degree Incidence

Spar Center Section Installed at 1 Degree Incidence

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.