Before moving on to the fuselage joining, I wanted to clean up and finish a few details related to the horizontal and vertical tail mounting. First, provisions were added for the fairing that will go between the horizontal and vertical tails. Flanges were fabricated and bent to the continuously varying angles required for the fairing. These were then riveted to each tail as shown in the pictures
Flanges for fairing being fabricated on horizontal tail