KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
' style=
Date:  3-7-2023
Number of Hours:  12.00
Manual Reference:  
Brief Description:  LH Stub Skin Preparations

Work shifted to the LH stub skin over the last few days. Similar to the RH skin, the left stub skin was drilled in place as shown in image 1. Since the left skin will have wing walk provisions, an .040 back-up skin was created. Also, all of the stiffeners that will be used along the entire length of the wing walk were also fabricated, these stiffeners are simple triangular hat sections and are show in image 2. Finally, image 3 shows the rows of fasteners that were drilled in the wing walk area for installation of the stiffeners.
Also, if you look really closely on image 1, you might be able to see a few more stiffeners at other locations on both left and right stub skins. I was having trouble getting the skins to look flat with no changes in smooth contour without the stiffeners. They are just simple .025 angles riveted with -3 rivets.
' style=

LH Stub skin drilled to substructure

LH Stub skin drilled to substructure

' style=

Wing walk stiffeners and back-up

Wing walk stiffeners and back-up

' style=

Drilling stiffeners into LH stub skin

Drilling stiffeners into LH stub skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.