Brief Description: Formed new 102.625 and 122.625 Bulkheads
Formed the replacement bulkheads and installed in the fixture. Installation did not require any alignment since the mounting provisions for the last bulkheads keyed off tooling holes that were reused for the new bulkheads. It looks like the strings align with the bulkheads very well now. I am optimistic that the skin will go on much better this time.
122.625 bulkheads formed
Forming the 102 Bulkhead
New bulkheads in the fixture and checking alignment