KitLog pro

Powered By Kitlog Pro v2.0

Tolliver's RV7A Factory
' style=
Date:  1-1-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fuel Pump Doubler

I countersunk the doubler and primed it. Match drilled the holes in the firewall.STAINLESS Sux! When I went to drill the 1/4 inch holes I burned up 2 bits. In retrospect I should have drilled a small pilot hole and then worked my way up. Riveted it in place with the nutplates. Its ready for the fuel pump.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.