KitLog pro

Powered By Kitlog Pro v2.0

Tolliver's RV7A Factory
' style=
Date:  11-5-2005
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Longerons

Finally completed the longeron bending. I actually over did the 2nd one but was able to tweak it back into shape. I edge prepped the aft decks and clamped into position for drilling. Back drilled the deck holes into the longeron. Clecoed as I went as usual. Moved on the the left one and am ready for the down bend and twist.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.