Powered By Kitlog Pro v2.0
Tolliver's RV7A Factory
RV-7A
Fuselage
4-20-2005
< Previous Log Entry
Next Log Entry >
Date:
4-20-2005
Number of Hours:
2.00
Manual Reference:
Brief Description:
Bulkheads
I was wrong.... there was still more fabrication. Had some more angles to cut. Clecoed the flap bellcrank and match drilled the bearing. Deburred the bellcrank to 706 bulkhead pieces.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
185
417
Empennage
63
139
Fuselage
118
272
Tools
2
2
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.