KitLog pro

Powered By Kitlog Pro v2.0

Tolliver's RV7A Factory
' style=
Date:  8-31-2005
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Parts Fabrication

Continued work on the tunnel cover. I screwed the side brackets to the left and right side of the floor panels and match drilled the cover in place. Dimpled the cover plate and counter sunk the side brackets. Ready to rivet.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.