Powered By Kitlog Pro v2.0
Tolliver's RV7A Factory
RV-7A
All
4-5-2005
< Previous Log Entry
Next Log Entry >
Date:
4-5-2005
Number of Hours:
2.00
Manual Reference:
Brief Description:
F-705 Bulkhead
Still waiting on Vans to get the replacement top channel that I screwed up. Scotchbrited the bottom, left and right channels and doublers. Ready for priming. Drilled the flap bearings and put back in flap motor bag.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
185
417
Empennage
63
139
Fuselage
118
272
Tools
2
2
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.