KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction
' style=
Date:  5-22-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Drilled left fuel tank skin

Drilled left and right fuel tank skins to ribs and baffle
' style=

The marks indicate the hole has been drilled

The marks indicate the hole has been drilled

' style=

For some reason the second hole in each rib is not prepunched

For some reason the second hole in each rib is not prepunched

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.