KitLog pro

Powered By Kitlog Pro v2.0

DANIEL'S WEB SITE
' style=
Date:  8-11-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Main Rotor Final Adjustments

Reinstalled the front tub section. Installed a rubber up stop for the collective and a rubber bottom bumper. It now has a minus 1.5 to plus 9.5 degrees of range. Torqued all bolts on the rotor head. Adjusted preload on c;yclic to 3 lbs at center of range.
' style=

Finished Main Rotor

Finished Main Rotor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.