KitLog pro

Powered By Kitlog Pro v2.0

DANIEL'S WEB SITE
' style=
Date:  6-11-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Ventilation and fuel shutoff

Final (?) installed the fuel shutoff linkage (very hard with wires all installed). Final installed the air and heat controls. Installed the air line from the valve mechanism back to the radiator shroud. Installed the red position light molex connector. Installed the secondary temperature sensor and connector.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.