KitLog pro

Powered By Kitlog Pro v2.0

DANIEL'S WEB SITE
' style=
Date:  2-1-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuel Tanks

Deburred all of the holes in the tanks. Flushed out the tanks. Installed the aluminum insulation and tape. Installed the line fittings in the tanks.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.