Laid out and drilled holes for instruments in floor pan. Laid out holes for fuel shut off, air, and intercom in middle of floor pan. Need to talk to Rotorway about location as the fuel shutoff control will be in a thick area of the fiberglass. Installed a ground screw on the back of the instrument panel. Riveted a plate with a flathead screw in it.