Cleaned up entry hole for step into baggage area. Prepared support block, drilled and bolted it to the mid baggage rib. Cleaned and primed the step before installing with a bolt. Needed to place step 45 1/4 inch aft of aft bulkhead. Began fabricating parts and supports for the upper fwd fuselage assembly, the support forf the avionics panel.