Finished bending, drilling, and riveting the leading edge of the elevators. Began preparing the tailcone. Machined the tie down. Needs assistance tapping a thread. Prepared the fuselage bulkheads and clecoed the tie down in place. Machined the rudder cable angle and attached nutplates. Cut a bulk head stiffener. Straightened the horizontal stabelizers attachment bars.