Worked on deburring the inspar ribs and nose ribs. Began building the jig to support construction of the horizontal stabelizer. Used 1 x 8 pine 8' lengths and fitted end to end to get a final length of 134 inches. Then stabelized laterally with 1 x 6 pine. Mounting four points to support the stabelizer.