KitLog pro

Powered By Kitlog Pro v2.0

Daniels Web Site
' style=
Date:  1-6-2008
Number of Hours:  20.00
Manual Reference:  
Brief Description:  Christmas 2007 Holiday Bucket of time and activity

The Christmas holiday was pack. I thought I would have a lot of time, but with the grandkids home there were more important things to do. Entertain the kids. I did sneak some time to work on the project and next few entries document the things I did and the time I spent. The locker and the gas tank used up all this time.
A small drill jig was used to drill the Dzus spring rivet holes. I drilled a No. 20 hole through the door and door stop to mark the center of the fastener. Used that hole to hold the jig with a cleco. It gave me the spacing for the rivets. Pretty simple but worked well.
The crimps on the angle for the locker door turned our well. Was a lot easier than I though it would be. I think I'm ready for the angles on the wing tips.
' style=

Locker starting to take shape.  There's enough room for a tent and a sleeping bag in this wing.

Locker starting to take shape. There's enough room for a tent and a sleeping bag in this wing.

' style=

An O-Ring on the Dzus quarter turn holds it in place quite  nicely.

An O-Ring on the Dzus quarter turn holds it in place quite nicely.

' style=

My home made tool to squeeze the c'sink into the Locker Door Stops for the Dzus spring rivets.

My home made tool to squeeze the c'sink into the Locker Door Stops for the Dzus spring rivets.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.