KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  9-23-2016
Number of Hours:  1.00
Manual Reference:  pgs 8-9
Brief Description:  Crankshaft assembly

Crank placed in freezer for 24 hours prior to assembly.
1715 Timing gear and prop hub heat soaked in oven at 500degF for two hours.
1930 Main bearing #1 oil supply hole enlarged to 1/8", outbord end chamfered slightly.
Assembled with JEG's assembly lube, part number: 555-28000.
Engine assembly stand slide bolt was loose resulting in crank falling onto my foot/toes after assembly.
2030 Finish
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.