KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  4-15-2018
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Clear Drainage

Removed small gravel from drainage pipe in the front of the hangar, Replaced it with large river rock.
Heaby rain later in the day didn't have any runoff into and through the hangar.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.