KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  9-16-2016
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Electrical Inspection

Added #4 Al ground to make 4-4-4-4 run; 2" PVC conduit to 1-1/2 knockout in meter stack; installed 120VAC 20 amp outlet; added bonding block on board with bare #4 Cu to ground rod at stack.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.