KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  5-13-2018
Number of Hours:  4.50
Manual Reference:  AeroVee pg20
Brief Description:  Initial Fence Baffle System Installation

Installation and fitup of the AeroVee cooling baffle system, began with rear left and right fence progressing around right side. Opening for oil return pass through needs increased opening to not interfere with fence positioning. Will need some sort of grommet to seal tubing to fence.
Research revealed that the lower sheet metal is not required for the top mounted cooler.
' style=

Right side with oil return pass through

Right side with oil return pass through

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.