Powered By Kitlog Pro v2.0
Dr. Pete's Xenos Build
Sonex XenosB
All
4-15-2018
< Previous Log Entry
Next Log Entry >
Date:
4-15-2018
Number of Hours:
1.00
Manual Reference:
Brief Description:
Clear Drainage
Removed small gravel from drainage pipe in the front of the hangar, Replaced it with large river rock.
Heaby rain later in the day didn't have any runoff into and through the hangar.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex XenosB Home
Category
# Logs
# Hours
All
610
1277
Avionics
17
43
Cockpit
25
43
Communications
6
8
Controls
52
86
Cowling
27
34
Empennage
96
198
Engine
75
149
Finish
6
9
Firewall Forward
54
89
Fuel System
12
12
Fuselage
13
10
Hangar
60
261
Instrument Panel
49
76
Landing Gear
42
48
Legal-FAA
5
6
Miscellaneous
4
20
Prop
5
2
Research
15
62
Shop Supplies
2
4
Tools
13
63
Wings
32
54
Copyright © 2001-2024 Matronics. All Rights Reserved.