KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  1-20-2018
Number of Hours:  1.00
Manual Reference:  XNB-L01
Brief Description:  Drill Landing Gear Legs at Axle

Setup landing gear legs on drill press with leveling stand supporting the far end. Near end clamped in vise. Using drill marks set with axles assemblies on airframe, drilled half way through diameter with a 1/8" HSS-Co bit. Took time to not heat the drill bit, using Boelube wax as a cutting oil. Turned leg to mark on reverse side to complete through hole. Both leg holes broke through from reverse hole near the center, resulting in centered 1/8" pilot hole through gear legs.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.