KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  4-22-2017
Number of Hours:  3.50
Manual Reference:  XNB-T02
Brief Description:  Prep Stabilator Skin

Prepared skin and structure for riveting. Cleco'd top and bottom sides. Updrilled top. Key factor in alignment was to correctly locate top outboard rear corner. Then worked top bottom edge. Hole for probe had to be expanded outboard slightly to allow for slight structure movement.

Used a ratched strap and a 2x4 across the underside leading edge to bring skin to alignment on bottom aft edge.Alignment to aft channel edge and 3/4" outboard skin to outboard rib.
' style=

Top side attached

Top side attached

' style=

Interior plumbing

Interior plumbing

' style=

Updrilling

Updrilling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.