KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  2-11-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Sliding Door

Took down temporary side boadrs and replaced with 2x12 lumber on existing strap inges. Secured top 14ga angle canvas carrier, canvas, and bottom chain to side boards. Twisted the north side #2 hanger after removing the roller supporting the #1 hanger. Added 12ga angle support from side board to canvas hanger to bear the weight.

Learned that the damage on the south corner was due to a C170 a first langing after purchas. The main gear was found to be misaligned and the tailwheel swivel stuck. Aircraft wing struck the hangar post bending the metal skin.

Will add a red bullseye target to the corner to ward off similar incidents.
' style=

Jeff @ south canvas door

Jeff @ south canvas door

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.