Powered By Kitlog Pro v2.0
Dr. Pete's Xenos Build
Sonex XenosB
All
2-5-2017
< Previous Log Entry
Next Log Entry >
Date:
2-5-2017
Number of Hours:
2.00
Manual Reference:
Dwg XNS-T06
Brief Description:
Stabilator Parts Planning
Stabilator Construction Planning, Ribs
XNS-T06 Stabilator Substructure Details
-08 Root Rib Clip, from 1/8"x2"x2" angle
--09R, -09L R&L hand clips, from 1/8"x2"x2" angle
-12 Rib #2, from SNX-Z02-Z04 channel stock. Finished length=19-7/8" + 31/64" + 1/2" + trim allowance = 21" + 1" allowance = 22"
-13 Rib #3, from SNX-Z02-Z04 channel stock. Finished length=17-27/32" + 31/64" + 1/2" + trim allowance = 19" + 1" allowance = 20"
-14 Rib #4, from SNX-Z02-Z04 channel stock. Finished length=16" + 31/64" + 1/2" + trim allowance = 17" + 1" allowance = 18"
-15 Rib #5, from SNX-Z02-Z04 channel stock. Finished length=14-3/32" + 31/64" + 1/2" + trim allowance = 15-1/4" + 1" allowance = 16-1/4"
-16 Rib #6, from SNX-Z02-Z04 channel stock. Finished length=12-1/16" + 31/64" + 1/2" + trim allowance = 13-1/4" + 1" allowance = 14-1/4"
Stabilator channel required for a single set of ribs is 90.5".
Spar channel material SNX-Z03-02 absent from shipped kit parts!
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex XenosB Home
Category
# Logs
# Hours
All
610
1277
Avionics
17
43
Cockpit
25
43
Communications
6
8
Controls
52
86
Cowling
27
34
Empennage
96
198
Engine
75
149
Finish
6
9
Firewall Forward
54
89
Fuel System
12
12
Fuselage
13
10
Hangar
60
261
Instrument Panel
49
76
Landing Gear
42
48
Legal-FAA
5
6
Miscellaneous
4
20
Prop
5
2
Research
15
62
Shop Supplies
2
4
Tools
13
63
Wings
32
54
Copyright © 2001-2024 Matronics. All Rights Reserved.