KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  1-29-2017
Number of Hours:  1.00
Manual Reference:  XNS-T03
Brief Description:  Study Tail Kit Plans, Stabilator

Tail Plans Arrive
XNS-T03 Stabilator Assbly, parts to fabricate
Clamp to fit air probe / and TE probe
Parts to purchase
For attachment of fiberglass stabilator tip MS24694-SS Machine Screw, qty 10 left, 10 right
MS21047 Anchor Nut, qty 10 left, 10 right
SSC-34 Flush Blind Rivet, qty 20 left, 20 right
Need a countersink.
Grommet AN931-3-5, qty 21 right only
The three lines are for Total Energy triple sense probes lines, as used on the factory aircraft. Check requirement for a single like this ILEC mount
Article on Total Engery Compensation in practice.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.