KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  1-22-2017
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Drainage, Weatherize


    Hangar entrance, north side


  • Dug drainage ditch

  • Installed permiable fabric in ditch

  • Installed perforated pipe in ditch

  • Covered pipe with gravel

  • Covered gravel with walkway grate, ballasted with additional gravel on front north hangar entrance.


Weatherizing



  • Cut T1-11 panels to 4' x 42" for hangar entrance above door

  • Hung one panel.

  • Welded/screwed panel pieces on south wall to cover crash damaged area


' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.