KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
' style=
Date:  10-9-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Prep rollers

Removed the balance of metal from front of hangar doorway. Evaluated AEP's work to meter stack. While drilling and tapping entry pipe for roller track, felt slight electrical shock from stray electrical current.

Cut more limbs from trees on the north rear of hangar.

Anna finished painting the picnic table.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.