Date:  8-14-2016
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Conduit run

Installed conduit, conduit supports, and clamps,
Twelve feet left to connect to main.

Rain shower mid-afternoon, leaks predominate at metal section joins. Soaked work platform flooring.