KitLog pro

Powered By Kitlog Pro v2.0

David's RV-7
' style=
Date:  7-3-2009
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Avionics Ground Point Installed

After a long work break, I was able to get back at it and have installed the ground point under the instrument sub-panel. The second pic shows it viewed from the bottom.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.