Powered By Kitlog Pro v2.0
David's RV-7
RV-7
Electrical
4-4-2009
< Previous Log Entry
Next Log Entry >
Date:
4-4-2009
Number of Hours:
8.00
Manual Reference:
Brief Description:
Aft Running Conduits
Installed conduits that run aft to the baggage compartment bulkhead. Installed pull strings into the conduits so that I can easily add wires later, if needed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
263
1053
Avionics
39
288
Canopy
18
79
Controls
19
54
Electrical
19
93
Empennage
58
178
Engine
4
8
Firewall
12
22
Fuselage
64
250
Wings
30
81
Copyright © 2001-2024 Matronics. All Rights Reserved.