KitLog pro

Powered By Kitlog Pro v2.0

David's RV-7
' style=
Date:  7-12-2007
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Gascolator Mounted

I installed the doubler and the gascolator tonight.

I got everything located and drilled yesterday and today I cleaned up the holes and dimpled for rivets. I also enlarged the hole for the fuel line elbow that transitions through the firewall and into the gascolator. With everything ready and the doubler primed, I riveted it into place.

Applied a small bead of sealant to the back of the gascolator and bolted it into place. I installed the elbow and fabricated the fule line that goes between the aux fuel pump and the gascolator. I must be getting good at bending tubing--it only took me 20 minutes to make the fuel line. :-)
' style=

Ready to Rivet

Ready to Rivet

' style=

Mounted (front view)

Mounted (front view)

' style=

Mounted (rear view)

Mounted (rear view)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.