KitLog pro

Powered By Kitlog Pro v2.0

David's RV-7
' style=
Date:  7-5-2006
Number of Hours:  2.50
Manual Reference:  Sec. 6-12
Brief Description:  Right Elevator Leading Edge

Bent the leading edge of the right elevator using a 3/4 in. galvanized water pipe wrapped in duct tape.

Next time do the segments separately--much easier that way.

Installed rod-end bearings to elevator spar.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.