KitLog pro

Powered By Kitlog Pro v2.0

David's RV-7
' style=
Date:  3-21-2006
Number of Hours:  3.50
Manual Reference:  Sec. 6
Brief Description:  Started on VS

Finished prepping the HS-405 ribs. Since I'm waiting on my new HS-702s to arrive, I decided to start on the Vertical Stabilizer.

This is very easy so far compared to the HS. I prepped the ribs after I clecoed the Spar Doubler to the rear spar. Match drilled the hinges and doubler, ribs, and spars. Then I clecoed the VS skin to the frame. Tomorrow I'll match drill the skins.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.