KitLog pro

Powered By Kitlog Pro v2.0

Daves Web site
' style=
Date:  7-7-2007
Number of Hours:  4.50
Manual Reference:  
Brief Description:  LH Fuel tank

7/5- 7/7 The LH fuel tank was preped with the sending unit and spaceres.
The leading edge of the LH wing was opened up and the fuel tank was installed. The drain and vent holes were drilled, and the fuel fill hole was cut. The sender and tank were grounded to the nose rib.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.