KitLog pro

Powered By Kitlog Pro v2.0

Daves Web site
' style=
Date:  12-22-2006
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Rear channel

12/21-12/22 The reinforcement doubler was laid out and fit to the rear channel.(Rear spare) The rear channels drilled and clecoed to the wing frame work.
' style=





' style=




' style=

Aileron control rod hole

Aileron control rod hole

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.