In id October, we took delivery of the hangar at Springbank Airport. Immediately we painted the walls anc ceiling, and then coated the floor with Endura Expoxy floor coatings.
After a 6 week vacation to Australia, we returned to find that the boys had moved the majority of the big pieces from the garage to the hangar so a lot of the heavy lifting had been done. In December we organized, moved tools, and built a workbench.